久久久久久精品国产欧美_久久久91精品国产一区二区三区_色综合久久一区二区三区_欧美性猛交一区二区三区精品,小说区亚洲综合第1页,小说区校园春色,小说区图片区综合久久,小说区图片区偷拍区另类

Feedback

Navigation:Home  ? News  ?  Company News

the gas pretreatment equipment to be used in the Tunlan Gas Generation project is going to be delivered

  • Published: 2017-05-27 16:56:00
  • Hits: 1892

We have signed with Xishan Coal Electricity Group the Agreement on Tunlan Gas Generation Project (Phase Three) Gas Pretreatment System. The project has a total treatment capacity of 4000Nm3/h and the equipment will be shipped in containers. We have carefully designed the products, effectively organized the production, and checked every product strictly before delivery. We have performed our duties under the agreement with both quality and quantity guaranteed. We have met all the technical performance requirements of the project. The equipment is now ready to be shipped to the project site under the proprietor’s instructions.


Equipment name: Gas Pretreatment System in Containers



Project Location: Tunlan Gas Generation Project Phase Three site, Gujiao, Shanxi



Size: 4000Nm3/h treatment capacity



Tel:025-84414484 Fax:025-86647595 Address:Wenying Road No.3,Binjiang Development Zone Jiangning District,Nanjing City


      Copyright by Nanjing Carbon Recycle Biomass Energy Co.,Ltd.